SDLongRange.com

All about long range sportfishing

Tuesday
May 22nd
Text size
  • Increase font size
  • Default font size
  • Decrease font size

projects continue

E-mail Print PDF
The boat work continues.  Today's pictures include the newly painted port main engine, not a new main just new paint.  Passengers sometimes wonder what is down in the fore peak, the forward hold or anchor locker of the Shogun.  Since I have to pull it out every year, I figured I would take a couple of pictures.  4 coils of rope at 600' x 1 3/16", four shots of chain at 200' x 1/2", five bumpers or fenders, 3 two hundred pound anchors and two 150 pound anchors(which are still in the hole).  The galley is coming along with some new flooring being layed down, a new air conditioning duct, and new counters being installed.  

And we still haven't hauled it out of the water yet.

Big Fish Happen,
Bruce A. Smith






 
Banner